Block laying
Our recent cabro block-laying project in Ngecha was completed in just under two weeks, thanks to efficient planning and a skilled team. The project covered a 500-square-meter area, requiring precision in ground leveling, proper drainage installation, and the use of high-quality interlocking cabros to ensure durability.
To guarantee a flawless finish, we implemented strict quality control measures at every stage — from base preparation to the final compaction. Safety protocols were followed throughout the project, and the result was a smooth, visually appealing, and long-lasting pavement that exceeded client expectations.